Projects

PREVIOUS COMMERCIAL PROJECTS


  • Montgomery Truss Panel Shop: electrical installation for 41,000 sq. ft. manufacturing facility
  • Grove Manor Assisted Living: 17 room addition, fire alarm system, and nurse call system
  • Shandaggan Fish Farm and Greenhouse: electrical installation for 67,000 sq. ft. agricultural facility
  • Franklin PA. Shop & Save: 18,000 sq. ft. new addition and complete renovations of existing 24,000 sq. ft. grocery store
  • Hickman Lumber: complete design-build electrical installation
  • Mercer County State Bank (Jackson Center Branch and Sandy Lake Branch): complete electrical installation for both new facilities
  • Millcreek Hardwood: design-build electrical system for wood flooring manufacturing plant
  • Clay Township Municipal Building: complete installation of wiring system to engineering specificationsGrove Manor Assisted Living: Entire facility emergency generator installation and electrical service upgrade
  • Grove Manor Assisted Living: Install an electrical system for a new elevator
  • Grove Manor Assisted Living: Physical Therapy addition
  • Fairview Swiss Cheese: Installation of all electrical systems supporting an electrical cogeneration system using food process waste byproducts to produce methane fuel for an on-site generator
  • The Great Stoneboro Fair: Providing management of buildings and grounds electrical systems before, during, and after the event, as well as upgrading the entire facility electrical system
  • Conneaut Lake Joint Municipal Authority: Upgrade the entire electrical system at a sewage wastewater treatment facility
  • McKean Sure Fine: Complete electrical service upgrade
  • Various retail space renovations at Grove City Factory Outlets, Cranberry Mall, and others.
Share by: